United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2024-155, Cherokee County
Solar project GEN-2024-155, Cherokee County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Cherokee County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-155
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Rusk - Crockett 345 kV Line
- Location
- Cherokee County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2029
- Withdrawn
- July 2025
Location
Marker shows the centre of Cherokee County; the queue data does not give exact sites.
Other requests in Cherokee County
- Lumberjack StorageBattery storage Β· 50.9 MW Β· agreement signed
- Eagle Pines GasGas Β· 1,174 MW Β· in study
- Rogers Creek BESSBattery storage Β· 100 MW Β· in study
- Gas project J480, Cherokee CountyGas Β· 1,240 MW Β· withdrawn
- Ponta Power PlantGas Β· 484 MW Β· withdrawn
- Ponta Power StationGas Β· 459 MW Β· withdrawn
- AltajacGas Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem