πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Walstrom

Walstrom is a 200 MW gas request withdrawn in the ERCOT interconnection queue, in Austin County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandonedFeb 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0112
Grid region
ERCOT (Texas)
Developer
Castleman Power
Connection point (POI)
46220 Peters 138kV
Location
Austin County, Texas
Technology
Gas: 200 MW
Total requested
200 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
2 July 2018
Proposed online date
February 2023
Withdrawn
February 2022

Location

Marker shows the centre of Austin County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Austin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem