United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
54.4 MW | Withdrawn / abandoned |
| Solar Increase (QP1145) Solar |
54.1 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
53.7 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
53.1 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
53.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
52.8 MW | Withdrawn / abandoned |
| Lewiston CMP Cluster 5 Solar + storage |
52.5 MW | Withdrawn / abandoned |
| Battery Storage Wind + storage |
52.3 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
51.7 MW | Withdrawn / abandoned |
| Solar Solar |
51.5 MW | Withdrawn / abandoned |
| Solar Solar |
51.4 MW | Withdrawn / abandoned |
| Solar Solar |
51.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Spruce Ridge Wind Farm Onshore wind |
50.8 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.7 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.4 MW | Withdrawn / abandoned |
| Solar Solar |
50.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar Solar |
50.0 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Chazy Lake BESS (NYISO-C24-308) Battery storage |
50.0 MW | Withdrawn / abandoned |
| Longfellow Wind Onshore wind |
50.0 MW | Withdrawn / abandoned |
| Kent County - NG WRI DG Area Study #2 >5 MW Solar |
49.8 MW | Withdrawn / abandoned |
| Biomass Project Other |
49.7 MW | Withdrawn / abandoned |
| Biomass Project Other |
49.7 MW | Withdrawn / abandoned |
| Chariot Solar Solar |
49.5 MW | Withdrawn / abandoned |
| Wood River Substation - Western RI DER Study #3 Solar |
49.0 MW | Withdrawn / abandoned |
| South Norwalk Repowering Gas |
48.9 MW | Withdrawn / abandoned |
| Wind Onshore wind |
48.0 MW | Withdrawn / abandoned |
| Eversource Group @ Wareham 714 Solar + storage |
48.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
48.0 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
48.0 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
47.5 MW | Withdrawn / abandoned |
| Solar Solar |
46.5 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
45.3 MW | Withdrawn / abandoned |
| Biomass Project Other |
45.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
45.0 MW | Withdrawn / abandoned |
| Solar Solar |
45.0 MW | Withdrawn / abandoned |
| Eversource Group @ West Pond 737 Solar + storage |
44.1 MW | Withdrawn / abandoned |
| Bear Swamp Uprate - First Unit Battery storage |
43.0 MW | Withdrawn / abandoned |
| Biomass Other |
42.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
41.2 MW | Withdrawn / abandoned |
| Biomass Project Other |
41.0 MW | Withdrawn / abandoned |
| Biomass Project Other |
41.0 MW | Withdrawn / abandoned |
| Combined Cycle Upgrade #1 Gas |
40.6 MW | Withdrawn / abandoned |
| Swain Solar Solar |
40.4 MW | Withdrawn / abandoned |
| Solar Solar |
40.0 MW | Withdrawn / abandoned |
| Solar (QF) Solar |
40.0 MW | Withdrawn / abandoned |
| Biomass Other |
40.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)