Withdrawn queue requests in ISO-NE (New England) — page 9

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown982118.1 GW
Active in queue14.6 GW72 requests
Agreement signed8,609 MW45 requests
Withdrawn982118.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

982 requests · page 9 of 20
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
54.4 MWWithdrawn / abandoned Grafton, NHISO-NE Oct 2022target 2024
Solar Increase (QP1145)
Solar
54.1 MWWithdrawn / abandoned Hancock, MEISO-NE Aug 2022target 2026
Battery Storage
Battery storage
53.7 MWWithdrawn / abandoned New Haven, CTISO-NE May 2023target 2026
Solar plus Battery
Solar + storage
53.1 MWWithdrawn / abandoned Merrimack, NHISO-NE Oct 2021target 2025
Wind Project
Onshore wind
53.0 MWWithdrawn / abandoned Caledonia, VTISO-NE May 2005target 2007
Wind
Onshore wind
52.8 MWWithdrawn / abandoned Penobscot, MEISO-NE Aug 2014target 2017
Lewiston CMP Cluster 5
Solar + storage
52.5 MWWithdrawn / abandoned Oxford, MEISO-NE Mar 2022target 2028
Battery Storage
Wind + storage
52.3 MWWithdrawn / abandoned Franklin, MEISO-NE Nov 2015target 2019
Battery Storage
Battery storage
51.7 MWWithdrawn / abandoned New London, CTISO-NE May 2022target 2025
Solar
Solar
51.5 MWWithdrawn / abandoned Somerset, MEISO-NE Sep 2023target 2027
Solar
Solar
51.4 MWWithdrawn / abandoned Hancock, MEISO-NE Feb 2021target 2024
Solar
Solar
51.0 MWWithdrawn / abandoned Grafton, NHISO-NE Jan 2020target 2022
Wind Project
Onshore wind
51.0 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2006target 2009
Spruce Ridge Wind Farm
Onshore wind
50.8 MWWithdrawn / abandoned Grafton, NHISO-NE Jan 2012target 2017
Battery Storage
Battery storage
50.7 MWWithdrawn / abandoned York, MEISO-NE Apr 2022target 2024
Battery Storage
Battery storage
50.4 MWWithdrawn / abandoned Providence, RIISO-NE Jan 2021target 2022
Solar
Solar
50.0 MWWithdrawn / abandoned York, MEISO-NE Dec 2018target 2021
Battery Storage
Battery storage
50.0 MWWithdrawn / abandoned New Haven, CTISO-NE Aug 2020target 2022
Battery Storage
Battery storage
50.0 MWWithdrawn / abandoned Hampden, MAISO-NE Dec 2023target 2028
Solar
Solar
50.0 MWWithdrawn / abandoned Hartford, CTISO-NE Oct 2018target 2022
Energy Storage
Battery storage
50.0 MWWithdrawn / abandoned Worcester, MAISO-NE Nov 2017target 2021
Chazy Lake BESS (NYISO-C24-308)
Battery storage
50.0 MWWithdrawn / abandoned Clinton, NYISO-NE Dec 2024target 2028
Longfellow Wind
Onshore wind
50.0 MWWithdrawn / abandoned Oxford, MEISO-NE May 2007target 2013
Kent County - NG WRI DG Area Study #2 >5 MW
Solar
49.8 MWWithdrawn / abandoned Kent, RIISO-NE Aug 2020target 2025
Biomass Project
Other
49.7 MWWithdrawn / abandoned Franklin, MAISO-NE Oct 2008target 2014
Biomass Project
Other
49.7 MWWithdrawn / abandoned Berkshire, MAISO-NE Jan 2009target 2013
Chariot Solar
Solar
49.5 MWWithdrawn / abandoned Cheshire, NHISO-NE Apr 2018target 2024
Wood River Substation - Western RI DER Study #3
Solar
49.0 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2024target 2026
South Norwalk Repowering
Gas
48.9 MWWithdrawn / abandoned Fairfield, CTISO-NE Jul 2000target 2011
Wind
Onshore wind
48.0 MWWithdrawn / abandoned Penobscot, MEISO-NE May 2010target 2016
Eversource Group @ Wareham 714
Solar + storage
48.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Apr 2020target 2023
Wind Project
Onshore wind
48.0 MWWithdrawn / abandoned Windham, VTISO-NE Dec 2005target 2008
Gas Turbine
Gas
48.0 MWWithdrawn / abandoned Hartford, CTISO-NE Mar 2007target 2009
Gas Turbine
Gas
47.5 MWWithdrawn / abandoned Chittenden, VTISO-NE Mar 2014target 2018
Solar
Solar
46.5 MWWithdrawn / abandoned Sullivan, NHISO-NE Nov 2022target 2023
Battery Storage
Battery storage
45.3 MWWithdrawn / abandoned Litchfield, CTISO-NE Jun 2024target 2027
Biomass Project
Other
45.0 MWWithdrawn / abandoned Hillsborough, NHISO-NE May 2007target 2010
Wind Project
Onshore wind
45.0 MWWithdrawn / abandoned Bennington, VTISO-NE Aug 2005target 2010
Solar
Solar
45.0 MWWithdrawn / abandoned Coos, NHISO-NE Oct 2019target 2024
Eversource Group @ West Pond 737
Solar + storage
44.1 MWWithdrawn / abandoned Plymouth, MAISO-NE Apr 2020target 2023
Bear Swamp Uprate - First Unit
Battery storage
43.0 MWWithdrawn / abandoned Berkshire, MAISO-NE Sep 2007target 2012
Biomass
Other
42.0 MWWithdrawn / abandoned Litchfield, CTISO-NE Feb 2005target 2007
Battery Storage
Battery storage
41.2 MWWithdrawn / abandoned Worcester, MAISO-NE Jul 2023target 2026
Biomass Project
Other
41.0 MWWithdrawn / abandoned Coos, NHISO-NE May 2007target 2010
Biomass Project
Other
41.0 MWWithdrawn / abandoned Coos, NHISO-NE Oct 2007target 2013
Combined Cycle Upgrade #1
Gas
40.6 MWWithdrawn / abandoned Worcester, MAISO-NE Feb 2015target 2018
Swain Solar
Solar
40.4 MWWithdrawn / abandoned Oxford, MEISO-NE Jul 2021target 2027
Solar
Solar
40.0 MWWithdrawn / abandoned Androscoggin, MEISO-NE Mar 2020target 2022
Solar (QF)
Solar
40.0 MWWithdrawn / abandoned Washington, RIISO-NE Oct 2018target 2025
Biomass
Other
40.0 MWWithdrawn / abandoned Somerset, MEISO-NE Aug 2005target 2008
Page 9 of 20

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)