Biomass Project

Biomass Project is a 41.0 MW other request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedOct 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
214
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH 115 kV S136 line
Location
Coos County, New Hampshire
Technology
Other: 41.0 MW
Total requested
41.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
21 May 2007
Proposed online date
August 2010
Withdrawn
October 2007

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem