United States › Grid › Interconnection queues › Maine
SOLAR + STORAGE · ISO-NELewiston CMP Cluster 5
Lewiston CMP Cluster 5 is a 52.5 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Oxford County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1242
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Lewiston
- Location
- Oxford County, Maine
- Technology
- Solar: 52.5 MW · Battery
- Total requested
- 52.5 MW
- Queue status
- Withdrawn
- Entered queue
- 28 March 2022
- Proposed online date
- June 2028
- Withdrawn
- June 2025
Location
Marker shows the centre of Oxford County; the queue data does not give exact sites.
Other requests in Oxford County
- Twin Energy WindOnshore wind · 18.3 MW · agreement signed
- Roxbury SolarSolar · 2.0 MW · agreement signed
- Record Hill WindOnshore wind · 50.6 MW · built
- Canton Mountain WindsOnshore wind · 19.3 MW · built
- Spruce Mountain WindOnshore wind · 18.0 MW · built
- RoxWindOnshore wind · 15.3 MW · built
- Rumford Uprate and Battery additionOther · 8.5 MW · built
- SolarSolar · 4.6 MW · built
- SolarSolar · 4.6 MW · built
- Spruce Mountain Wind IncreaseOnshore wind · 2.0 MW · built
- 13665 Felt Road SolarSolar + storage · 2.0 MW · built
- Rumford Falls Unit #3 increaseHydro · 1.3 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem