United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 45.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
936
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV bus of Eversource Paris Substation.
Location
Coos County, New Hampshire
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
30 October 2019
Proposed online date
October 2024
Withdrawn
December 2023

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem