SOLAR Β· ISO-NE

Chariot Solar

Chariot Solar is a 49.5 MW solar request withdrawn in the ISO-NE interconnection queue, in Cheshire County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. ConsentedOct 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
727
Grid region
ISO-NE (New England)
Connection point (POI)
NGrid 115 kV Vernon Road tap to Vernon Road Substation, 2.5 mi from Vernon Road Substation
Location
Cheshire County, New Hampshire
Technology
Solar: 49.5 MW
Total requested
49.5 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
10 April 2018
Agreement signed
14 October 2020
Proposed online date
December 2024
Withdrawn
January 2025

Location

Marker shows the centre of Cheshire County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Cheshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem