United States › Grid › Interconnection queues › New Hampshire
SOLAR + STORAGE · ISO-NESolar plus Battery
Solar plus Battery is a 102 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Cheshire County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1316
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource 115kV line L163
- Location
- Cheshire County, New Hampshire
- Technology
- Solar: 102 MW · Battery
- Total requested
- 102 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2022
- Proposed online date
- October 2027
- Withdrawn
- August 2023
Location
Marker shows the centre of Cheshire County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Cheshire County
- Energy CenterGas · 570 MW · withdrawn
- SolarSolar · 98.0 MW · withdrawn
- SolarSolar · 78.4 MW · withdrawn
- SolarSolar · 65.0 MW · withdrawn
- Chariot SolarSolar · 49.5 MW · withdrawn
- BiomassOther · 40.0 MW · withdrawn
- SolarSolar · 30.0 MW · withdrawn
- SolarSolar · 30.0 MW · withdrawn
- BiomassOther · 20.0 MW · withdrawn
- Biomass ProjectOther · 20.0 MW · withdrawn
- SolarSolar · 20.0 MW · withdrawn
- SolarSolar · 14.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem