United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
OTHER Β· ISO-NEBiomass Project
Biomass Project is a 20.0 MW other request withdrawn in the ISO-NE interconnection queue, in Cheshire County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2008 (completed)
- Withdrawn / abandonedSep 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 242
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- PSNH 115 kV N186 circuit
- Location
- Cheshire County, New Hampshire
- Technology
- Other: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 3 January 2008
- Proposed online date
- October 2013
- Withdrawn
- September 2009
Location
Marker shows the centre of Cheshire County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Cheshire County
- Energy CenterGas Β· 570 MW Β· withdrawn
- Solar plus BatterySolar + storage Β· 102 MW Β· withdrawn
- SolarSolar Β· 98.0 MW Β· withdrawn
- SolarSolar Β· 78.4 MW Β· withdrawn
- SolarSolar Β· 65.0 MW Β· withdrawn
- Chariot SolarSolar Β· 49.5 MW Β· withdrawn
- BiomassOther Β· 40.0 MW Β· withdrawn
- SolarSolar Β· 30.0 MW Β· withdrawn
- SolarSolar Β· 30.0 MW Β· withdrawn
- BiomassOther Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 14.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem