πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 98.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Cheshire County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2016 (completed)
  2. Withdrawn / abandonedSep 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
587
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV Eversource Fitzwilliam Substation
Location
Cheshire County, New Hampshire
Technology
Solar: 98.0 MW
Total requested
98.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
7 January 2016
Proposed online date
July 2018
Withdrawn
September 2016

Location

Marker shows the centre of Cheshire County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Cheshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem