BATTERY STORAGE · ISO-NEChazy Lake BESS (NYISO-C24-308)
Chazy Lake BESS (NYISO-C24-308) is a 50.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Clinton County, New York.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2024 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1600
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NYISO Patnode 230 kV
- Location
- Clinton County, New York
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 12 December 2024
- Proposed online date
- August 2028
- Withdrawn
- March 2025
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Bull Run II WindOnshore wind · 449 MW · in study
- Valcour StorageBattery storage · 150 MW · in study
- Leo Energy StorageBattery storage · 75.0 MW · in study
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Clinton WindfieldOnshore wind · 79.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem