United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOLeo Energy Storage
Leo Energy Storage is a 75.0 MW battery storage request in interconnection study in the NYISO interconnection queue, in Clinton County, New York, connecting to NYSEG.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-317
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- BGTF US Development Holdings LLC
- Connection point (POI)
- Lyon Mountain 115 kV Substation
- Location
- Clinton County, New York
- Technology
- Battery: 75.0 MW
- Total requested
- 75.0 MW
- Queue status
- Active
- Entered queue
- 3 October 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Bull Run II WindOnshore wind · 449 MW · in study
- Valcour StorageBattery storage · 150 MW · in study
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Clinton WindfieldOnshore wind · 79.5 MW · built
- Clinton WindfieldOnshore wind · 79.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem