BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 51.7 MW battery storage request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandonedJun 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1267
Grid region
ISO-NE (New England)
Connection point (POI)
Groton Utilities Buddington Substation, 69kV bus (future 115kV) Alternate POI: Groton Utilities Buddington Substation, 34.5kV bus
Location
New London County, Connecticut
Technology
Battery: 51.7 MW
Total requested
51.7 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
20 May 2022
Proposed online date
August 2025
Withdrawn
June 2022

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in New London County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem