GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 48.0 MW gas request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2007 (completed)
  2. Withdrawn / abandonedApr 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
204
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P Windsor locks substation
Location
Hartford County, Connecticut
Technology
Gas: 48.0 MW Β· Oil
Total requested
48.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
30 March 2007
Proposed online date
December 2009
Withdrawn
April 2007

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Hartford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem