United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
SOLAR Β· ISO-NESolar
Solar is a 54.4 MW solar request withdrawn in the ISO-NE interconnection queue, in Grafton County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2022 (completed)
- Withdrawn / abandonedMay 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1329
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- POI: (44.321330Β¬β, -72.003124Β¬β), National Grid's PTF 230 kV bus at Comerford No. 18 station
- Location
- Grafton County, New Hampshire
- Technology
- Solar: 54.4 MW
- Total requested
- 54.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 24 October 2022
- Proposed online date
- June 2024
- Withdrawn
- May 2023
Location
Marker shows the centre of Grafton County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Grafton County
- Groton Wind FarmOnshore wind Β· 48.0 MW Β· built
- Indeck Energy AlexandriaOther Β· 16.5 MW Β· built
- Moore Station UprateHydro Β· 4.6 MW Β· built
- Comerford Unit #1Hydro Β· -17.0 MW Β· built
- SolarSolar Β· 150 MW Β· withdrawn
- Energy StorageBattery storage Β· 100 MW Β· withdrawn
- SolarSolar Β· 60.0 MW Β· withdrawn
- SolarSolar Β· 51.0 MW Β· withdrawn
- Spruce Ridge Wind FarmOnshore wind Β· 50.8 MW Β· withdrawn
- SolarSolar Β· 33.1 MW Β· withdrawn
- SolarSolar Β· 27.0 MW Β· withdrawn
- SolarSolar Β· 21.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem