United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 33.1 MW solar request withdrawn in the ISO-NE interconnection queue, in Grafton County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
898
Grid region
ISO-NE (New England)
Connection point (POI)
NGRID 34.5kV transmission/distribution line 3318 in Monroe, NH
Location
Grafton County, New Hampshire
Technology
Solar: 33.1 MW
Total requested
33.1 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
26 July 2019
Proposed online date
June 2022
Withdrawn
August 2019

Location

Marker shows the centre of Grafton County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Grafton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem