United States › Grid › Interconnection queues › New Hampshire

BATTERY STORAGE · ISO-NE

Energy Storage

Energy Storage is a 100 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Grafton County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
871
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH 115kV Littleton substation
Location
Grafton County, New Hampshire
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 March 2019
Proposed online date
May 2023
Withdrawn
January 2020

Location

Marker shows the centre of Grafton County; the queue data does not give exact sites.

Power plants in New Hampshire · Transmission lines in New Hampshire

Other requests in Grafton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem