United States › Grid › Interconnection queues › Connecticut

ONSHORE WIND · ISO-NE

Wind Project

Wind Project is a 51.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2006 (completed)
  2. Withdrawn / abandonedJun 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
145
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 115 kV 1607 line
Location
Windham County, Connecticut
Technology
Wind: 51.0 MW
Total requested
51.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
13 February 2006
Proposed online date
December 2009
Withdrawn
June 2008

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem