πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

OTHER Β· ISO-NE

Biomass Project

Biomass Project is a 41.0 MW other request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2007 (completed)
  2. Withdrawn / abandonedSep 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
229
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH 34.5 kV circuit from Lost Nation or Whitefiel
Location
Coos County, New Hampshire
Technology
Other: 41.0 MW
Total requested
41.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
15 October 2007
Proposed online date
December 2013
Withdrawn
September 2008

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem