Interconnection queue in California — page 6

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown464179.2 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

464 requests · page 6 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Windstar I Alternate
Wind + storage
240 MWAgreement signed Kern, CACAISO Apr 20062012
Midway Peaking
Gas
240 MWAgreement signed Fresno, CACAISO Jan 20052009
Sapphire Solar
Solar + storage
234 MWAgreement signed Riverside, CACAISO Apr 2020target 2034
Heartland 2
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Heartland 1
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Baldy Mesa
Solar + storage
225 MWAgreement signed San Bernardino, CACAISO May 2017target 2026
Solar + storage project Q75, Kern County
Solar + storage
225 MWIn study Kern, CAWest Jan 2020target 2022
Allium Hybrid
Solar + storage
225 MWAgreement signed San Benito, CACAISO Apr 2021target 2030
Dorian Storage
Battery storage
214 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2034
Zeus BESS
Battery storage
214 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Weston Storage
Battery storage
214 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Frigatebird Storage
Battery storage
214 MWIn study San Diego, CACAISO Apr 2021target 2035
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Desert Jewel Storage
Battery storage
206 MWAgreement signed San Diego, CACAISO Apr 2021target 2029
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Fountain Wind
Onshore wind
206 MWAgreement signed Shasta, CACAISO Apr 2015target 2027
Emerita Energy Storage
Battery storage
206 MWIn study Alameda, CACAISO Apr 2023target 2028
Helios Grid Reliability
Battery storage
206 MWIn study Calaveras, CACAISO Apr 2023target 2028
Telluride
Solar + storage
205 MWIn study Fresno, CACAISO Apr 2023target 2030
Cabrera Reliability
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Antlia
Battery storage
205 MWIn study Monterey, CACAISO Apr 2023target 2031
Saguaro Energy Storage
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2029
Mt Baldy Energy Storage 2
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Battery storage project 16, Sacramento County
Battery storage
204 MWIn study Sacramento, CAWest Jan 2022target 2027
Phaenon
Solar + storage
204 MWIn study Kern, CACAISO Apr 2021target 2029
Huaso Hybrid
Solar + storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2026
Puma Storage
Battery storage
204 MWIn study Madera, CACAISO Apr 2021target 2030
Seahawk Storage
Battery storage
204 MWAgreement signed Santa Cruz, CACAISO Apr 2021target 2029
Cougar Storage
Battery storage
204 MWAgreement signed Merced, CACAISO Apr 2021target 2030
Apache Storage
Battery storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Kingsroad Hybrid Solar
Solar + storage
204 MWAgreement signed Kern, CACAISO Apr 2019target 2028
Puff Hybrid Solar
Solar + storage
204 MWIn study Kern, CACAISO Apr 2020target 2030
Little Bear 4
Solar + storage
203 MWAgreement signed Fresno, CACAISO Apr 20152020
Aramis Power Plant
Solar + storage
203 MWAgreement signed Alameda, CACAISO May 2017target 2026
Las Camas 3
Solar + storage
203 MWAgreement signed Merced, CACAISO Apr 2018target 2027
Las Camas 1
Solar + storage
203 MWAgreement signed Merced, CACAISO May 2017target 2027
Brundage Energy Storage
Battery storage
202 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Everest Energy Storage
Battery storage
202 MWIn study Kern, CACAISO Apr 2021target 2030
Battery storage project Q81, Los Angeles County
Battery storage
200 MWIn study Los Angeles, CAWest May 2021target 2024
Kestrel Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2027
Tendril
Solar + storage
200 MWIn study Kern, CACAISO Apr 2023target 2031
Merlin Storage
Battery storage
200 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Battery storage project SC1Q32, Sacramento County
Battery storage
200 MWIn study Sacramento, CAWest Jul 2025target 2031
Battery storage project 11, Sacramento County
Battery storage
200 MWIn study Sacramento, CAWest Apr 2021target 2026
Big Rock Solar Farm
Battery storage
200 MWAgreement signed Imperial, CACAISO Apr 2015target 2025
Sandpiper Storage
Battery storage
200 MWAgreement signed Orange, CACAISO Apr 2019target 2026
Tanager Storage
Battery storage
200 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2027
Avocet Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2026
Conduit Energy Storage 2
Battery storage
199 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Page 6 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)