United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in California — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Windstar I Alternate Wind + storage |
240 MW | Agreement signed |
| Midway Peaking Gas |
240 MW | Agreement signed |
| Sapphire Solar Solar + storage |
234 MW | Agreement signed |
| Heartland 2 Solar + storage |
228 MW | Agreement signed |
| Heartland 1 Solar + storage |
228 MW | Agreement signed |
| Baldy Mesa Solar + storage |
225 MW | Agreement signed |
| Solar + storage project Q75, Kern County Solar + storage |
225 MW | In study |
| Allium Hybrid Solar + storage |
225 MW | Agreement signed |
| Dorian Storage Battery storage |
214 MW | Agreement signed |
| Zeus BESS Battery storage |
214 MW | Agreement signed |
| Weston Storage Battery storage |
214 MW | In study |
| Frigatebird Storage Battery storage |
214 MW | In study |
| Octans Solar + storage |
207 MW | In study |
| Desert Jewel Storage Battery storage |
206 MW | Agreement signed |
| Fornax Solar + storage |
206 MW | In study |
| Rover Battery storage |
206 MW | In study |
| Fountain Wind Onshore wind |
206 MW | Agreement signed |
| Emerita Energy Storage Battery storage |
206 MW | In study |
| Helios Grid Reliability Battery storage |
206 MW | In study |
| Telluride Solar + storage |
205 MW | In study |
| Cabrera Reliability Battery storage |
205 MW | In study |
| Antlia Battery storage |
205 MW | In study |
| Saguaro Energy Storage Battery storage |
205 MW | In study |
| Mt Baldy Energy Storage 2 Battery storage |
205 MW | In study |
| Battery storage project 16, Sacramento County Battery storage |
204 MW | In study |
| Phaenon Solar + storage |
204 MW | In study |
| Huaso Hybrid Solar + storage |
204 MW | Agreement signed |
| Puma Storage Battery storage |
204 MW | In study |
| Seahawk Storage Battery storage |
204 MW | Agreement signed |
| Cougar Storage Battery storage |
204 MW | Agreement signed |
| Apache Storage Battery storage |
204 MW | Agreement signed |
| Kingsroad Hybrid Solar Solar + storage |
204 MW | Agreement signed |
| Puff Hybrid Solar Solar + storage |
204 MW | In study |
| Little Bear 4 Solar + storage |
203 MW | Agreement signed |
| Aramis Power Plant Solar + storage |
203 MW | Agreement signed |
| Las Camas 3 Solar + storage |
203 MW | Agreement signed |
| Las Camas 1 Solar + storage |
203 MW | Agreement signed |
| Brundage Energy Storage Battery storage |
202 MW | In study |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Battery storage project Q81, Los Angeles County Battery storage |
200 MW | In study |
| Kestrel Storage Battery storage |
200 MW | Agreement signed |
| Tendril Solar + storage |
200 MW | In study |
| Merlin Storage Battery storage |
200 MW | In study |
| Battery storage project SC1Q32, Sacramento County Battery storage |
200 MW | In study |
| Battery storage project 11, Sacramento County Battery storage |
200 MW | In study |
| Big Rock Solar Farm Battery storage |
200 MW | Agreement signed |
| Sandpiper Storage Battery storage |
200 MW | Agreement signed |
| Tanager Storage Battery storage |
200 MW | Agreement signed |
| Avocet Storage Battery storage |
200 MW | Agreement signed |
| Conduit Energy Storage 2 Battery storage |
199 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)