SOLAR + STORAGE · CAISOAllium Hybrid
Allium Hybrid is a 225 MW solar + storage request with a signed interconnection agreement in the CAISO interconnection queue, in San Benito County, California, connecting to PGAE.
Queue statusConsented
- PlanningQueued Apr 2021 (completed)
- ConsentedMar 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 1921
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Crazy Horse Canyon-Hollister 115 kV Line
- Location
- San Benito County, California
- Technology
- Solar: 113 MW · Battery: 112 MW
- Total requested
- 225 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Active
- Entered queue
- 15 April 2021
- Agreement signed
- 5 March 2025
- Proposed online date
- December 2030
Location
Marker shows the centre of San Benito County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in San Benito County
- PV2 Panoche Valley Solar (Aka Sge Panoche Valley Solar)Solar · 140 MW · built
- Mystic RidgeSolar + storage · 412 MW · withdrawn
- Panoche Valley Solar Farm ExpansionSolar · 400 MW · withdrawn
- AlliumSolar + storage · 229 MW · withdrawn
- FoothillsSolar + storage · 207 MW · withdrawn
- Boa Vista StorageBattery storage · 109 MW · withdrawn
- Panoche Valley Solar FarmSolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem