United States › Grid › Interconnection queues › California
SOLAR + STORAGE · CAISOMystic Ridge
Mystic Ridge is a 412 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Benito County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2255
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- LOS BANOS 500 kV
- Location
- San Benito County, California
- Technology
- Solar: 206 MW · Battery: 206 MW
- Total requested
- 412 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- April 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of San Benito County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in San Benito County
- Allium HybridSolar + storage · 225 MW · agreement signed
- PV2 Panoche Valley Solar (Aka Sge Panoche Valley Solar)Solar · 140 MW · built
- Panoche Valley Solar Farm ExpansionSolar · 400 MW · withdrawn
- AlliumSolar + storage · 229 MW · withdrawn
- FoothillsSolar + storage · 207 MW · withdrawn
- Boa Vista StorageBattery storage · 109 MW · withdrawn
- Panoche Valley Solar FarmSolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem