Allium is a 229 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Benito County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedApr 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1711
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Hollister Substation 115kV
- Location
- San Benito County, California
- Technology
- Solar: 115 MW Β· Battery: 115 MW
- Total requested
- 229 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2020
- Proposed online date
- December 2023
- Withdrawn
- April 2021
Location
Marker shows the centre of San Benito County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in San Benito County
- Allium HybridSolar + storage Β· 225 MW Β· agreement signed
- PV2 Panoche Valley Solar (Aka Sge Panoche Valley Solar)Solar Β· 140 MW Β· built
- Mystic RidgeSolar + storage Β· 412 MW Β· withdrawn
- Panoche Valley Solar Farm ExpansionSolar Β· 400 MW Β· withdrawn
- FoothillsSolar + storage Β· 207 MW Β· withdrawn
- Boa Vista StorageBattery storage Β· 109 MW Β· withdrawn
- Panoche Valley Solar FarmSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem