Boa Vista Storage

Boa Vista Storage is a 109 MW battery storage request withdrawn in the CAISO interconnection queue, in San Benito County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1927
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
San Benito - Hollister 115kV line
Location
San Benito County, California
Technology
Battery: 109 MW
Total requested
109 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2025
Withdrawn
November 2022

Location

Marker shows the centre of San Benito County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Benito County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem