United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cielo Vista Solar Solar + storage · Cielo Vista Solar, LLC |
503 MW | In study |
| Gypsum Plains Solar Solar + storage · Gypsum Plains Solar, LLC |
503 MW | In study |
| Magnet Solar Solar + storage · HyFuels Big Spring Solar LLC |
503 MW | Agreement signed |
| Pinnington Storage Solar + storage · Hecate Energy Longhorn Storage LLC |
503 MW | In study |
| Muy Grande Solar Solar · ACE DevCo NC, LLC |
503 MW | In study |
| Dog Star Solar II Solar · Dog Star Solar LLC |
503 MW | In study |
| Dog Star Solar I Solar · Dog Star Solar LLC |
503 MW | In study |
| Duffy Solar Solar + storage · VDA Solar Texas 1 LLC |
503 MW | Agreement signed |
| Austin Bayou Solar Solar + storage · Austin Bayou Solar, LLC |
503 MW | Agreement signed |
| River Boat Solar Solar + storage · Champion Creek Solar, LLC |
502 MW | In study |
| Commodus Solar Solar · IP Blackwell, LLC |
502 MW | In study |
| Cavell Solar Solar · IP Cavell, LLC |
502 MW | In study |
| Commodus 2 Solar Solar · IP Blackwell II, LLC |
502 MW | In study |
| Freedom Falcon BESS Battery storage · Falcon BESS, LLC |
502 MW | In study |
| Titus Sienta Solar Solar · Sol Sienta Solar, LLC |
502 MW | In study |
| Orbit Energy Storage Battery storage · GCI Orbit Energy Storage, LLC |
502 MW | In study |
| Millsing BESS Battery storage · Millsing BESS |
502 MW | In study |
| Lyra Solar Solar + storage · Juno Solar 4 |
500 MW | Agreement signed |
| MRR Solar Solar · BOULEVARD ASSOCIATES, LLC |
500 MW | In study |
| Elk Ridge Solar Solar · Boulevard Associates, LLC |
500 MW | In study |
| Solar + storage project GEN-2024-266, Potter County Solar + storage |
500 MW | In study |
| Antila Solar Solar · Antila Solar LLC |
500 MW | Agreement signed |
| Draco Solar Solar · Draco Solar LLC |
500 MW | In study |
| Lyra Storage Solar + storage · JUNO BESS I |
500 MW | Agreement signed |
| Aquila Solar Solar · Ben Milam Solar 5 |
500 MW | In study |
| Onshore wind project ERAS-2025-021, Hale County Onshore wind |
500 MW | In study |
| Betel Storage I Battery storage · BETEL STORAGE I |
500 MW | In study |
| Juno 3 Solar Solar · Juno Solar 3 |
500 MW | Agreement signed |
| Betel Storage II Battery storage · BETEL STORAGE II |
500 MW | In study |
| Black Mountain Somervell Gas Combined Gas · Fort Worth Power Core LLC |
495 MW | In study |
| Siete Onshore wind · Apex Clean Energy |
493 MW | Agreement signed |
| Siete Wind Onshore wind · Siete Wind, LLC |
493 MW | In study |
| Halyard Wharton Gas · Halyard Energy |
484 MW | Paused / redesign |
| North Royal Thermal (TEF- Due Diligence) Gas · Invenergy Energy Transition Development LLC |
479 MW | In study |
| Mirando Valley Wind Onshore wind · ACE DevCo NC LLC |
479 MW | In study |
| Gas project E0032, San Jacinto County Gas · Entergy Texas, Inc. |
478 MW | In study |
| Alkali Creek Wind Onshore wind · Alkali Creek Wind, LLC |
474 MW | In study |
| Serenity Wind Onshore wind · Serenity Wind, LLC |
473 MW | In study |
| Gas project GEN-2024-343, Harrison County Gas |
471 MW | In study |
| Gregory Power Development SLF Gas · Gregory Power Partners LLC |
470 MW | In study |
| Baker Branch Solar Solar · Mockingbird Solar Center, LLC |
469 MW | Agreement signed |
| Hollow Branch Creek Storage Solar + storage · Hollow Branch Creek Solar LLC |
460 MW | In study |
| Hollow Branch Creek Solar Solar + storage · Hollow Branch Creek Solar LLC |
460 MW | Agreement signed |
| NRG THW GT 345 (Tef) Gas · NRG THW GT LLC |
456 MW | Agreement signed |
| Salt-Lick Solar Solar + storage · Salt-Lick Solar, LLC |
453 MW | In study |
| TRIFECTA Gas Gas · NET Power |
453 MW | In study |
| Soleil Solar Solar · Soleil Solar, LLC |
452 MW | Agreement signed |
| Zeissel Solar Solar · ZSS Power, LLC |
452 MW | Agreement signed |
| Cedar Draw Solar Solar + storage · Cedar Draw Solar LLC |
451 MW | In study |
| Calpine Guadalupe Peakers Gas · Guadalupe Peaking Energy Center, LLC |
450 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)