🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,094476.4 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,094 requests · page 4 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Cielo Vista Solar
Solar + storage · Cielo Vista Solar, LLC
503 MWIn study Duval, TXERCOT Apr 2025target 2028
Gypsum Plains Solar
Solar + storage · Gypsum Plains Solar, LLC
503 MWIn study Ector, TXERCOT Jun 2025target 2029
Magnet Solar
Solar + storage · HyFuels Big Spring Solar LLC
503 MWAgreement signed Borden, TXERCOT Apr 2025target 2028
Pinnington Storage
Solar + storage · Hecate Energy Longhorn Storage LLC
503 MWIn study Jack, TXERCOT Dec 2020target 2029
Muy Grande Solar
Solar · ACE DevCo NC, LLC
503 MWIn study Starr, TXERCOT Jan 2024target 2029
Dog Star Solar II
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Dog Star Solar I
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Duffy Solar
Solar + storage · VDA Solar Texas 1 LLC
503 MWAgreement signed Matagorda, TXERCOT Sep 2020target 2027
Austin Bayou Solar
Solar + storage · Austin Bayou Solar, LLC
503 MWAgreement signed Brazoria, TXERCOT Jun 2022target 2027
River Boat Solar
Solar + storage · Champion Creek Solar, LLC
502 MWIn study Mitchell, TXERCOT Sep 2024target 2028
Commodus Solar
Solar · IP Blackwell, LLC
502 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Solar
Solar · IP Cavell, LLC
502 MWIn study Castro, TXERCOT Jul 2024target 2029
Commodus 2 Solar
Solar · IP Blackwell II, LLC
502 MWIn study Swisher, TXERCOT Mar 2025target 2029
Freedom Falcon BESS
Battery storage · Falcon BESS, LLC
502 MWIn study Zapata, TXERCOT Jun 2023target 2028
Titus Sienta Solar
Solar · Sol Sienta Solar, LLC
502 MWIn study Pecos, TXERCOT Oct 2023target 2028
Orbit Energy Storage
Battery storage · GCI Orbit Energy Storage, LLC
502 MWIn study Bexar, TXERCOT Nov 2023target 2027
Millsing BESS
Battery storage · Millsing BESS
502 MWIn study Grimes, TXERCOT Feb 2024target 2028
Lyra Solar
Solar + storage · Juno Solar 4
500 MWAgreement signed Borden, TXERCOT Mar 2025target 2027
MRR Solar
Solar · BOULEVARD ASSOCIATES, LLC
500 MWIn study Pecos, TXERCOT Jul 2025target 2030
Elk Ridge Solar
Solar · Boulevard Associates, LLC
500 MWIn study Pecos, TXERCOT Nov 2025target 2030
Solar + storage project GEN-2024-266, Potter County
Solar + storage
500 MWIn study Potter, TXSPP Mar 2025target 2033
Antila Solar
Solar · Antila Solar LLC
500 MWAgreement signed Borden, TXERCOT Apr 2025target 2027
Draco Solar
Solar · Draco Solar LLC
500 MWIn study Borden, TXERCOT Apr 2025target 2027
Lyra Storage
Solar + storage · JUNO BESS I
500 MWAgreement signed Borden, TXERCOT May 2025target 2026
Aquila Solar
Solar · Ben Milam Solar 5
500 MWIn study Milam, TXERCOT Nov 2025target 2026
Onshore wind project ERAS-2025-021, Hale County
Onshore wind
500 MWIn study Hale, TXSPP Oct 2025target 2030
Betel Storage I
Battery storage · BETEL STORAGE I
500 MWIn study Milam, TXERCOT Jan 2025target 2026
Juno 3 Solar
Solar · Juno Solar 3
500 MWAgreement signed Borden, TXERCOT Mar 2025target 2027
Betel Storage II
Battery storage · BETEL STORAGE II
500 MWIn study Milam, TXERCOT Jan 2025target 2026
Black Mountain Somervell Gas Combined
Gas · Fort Worth Power Core LLC
495 MWIn study Somervell, TXERCOT Apr 2025target 2029
Siete
Onshore wind · Apex Clean Energy
493 MWAgreement signed Webb, TXERCOT Oct 2018target 2028
Siete Wind
Onshore wind · Siete Wind, LLC
493 MWIn study Webb, TXERCOT Jul 2025target 2028
Halyard Wharton
Gas · Halyard Energy
484 MWPaused / redesign Wharton, TXERCOT Mar 2014target 2021
North Royal Thermal (TEF- Due Diligence)
Gas · Invenergy Energy Transition Development LLC
479 MWIn study Lamar, TXERCOT Jun 2024target 2030
Mirando Valley Wind
Onshore wind · ACE DevCo NC LLC
479 MWIn study Jim Hogg, TXERCOT Aug 2024target 2028
Gas project E0032, San Jacinto County
Gas · Entergy Texas, Inc.
478 MWIn study San Jacinto, TXMISO Aug 2025target 2027
Alkali Creek Wind
Onshore wind · Alkali Creek Wind, LLC
474 MWIn study Fisher, TXERCOT Aug 2025target 2028
Serenity Wind
Onshore wind · Serenity Wind, LLC
473 MWIn study Armstrong, TXERCOT Mar 2025target 2028
Gas project GEN-2024-343, Harrison County
Gas
471 MWIn study Harrison, TXSPP Mar 2025target 2030
Gregory Power Development SLF
Gas · Gregory Power Partners LLC
470 MWIn study San Patricio, TXERCOT Nov 2024target 2028
Baker Branch Solar
Solar · Mockingbird Solar Center, LLC
469 MWAgreement signed Lamar, TXERCOT Mar 2020target 2026
Hollow Branch Creek Storage
Solar + storage · Hollow Branch Creek Solar LLC
460 MWIn study Leon, TXERCOT Sep 2022target 2027
Hollow Branch Creek Solar
Solar + storage · Hollow Branch Creek Solar LLC
460 MWAgreement signed Leon, TXERCOT Sep 2022target 2027
NRG THW GT 345 (Tef)
Gas · NRG THW GT LLC
456 MWAgreement signed Harris, TXERCOT Nov 2022target 2026
Salt-Lick Solar
Solar + storage · Salt-Lick Solar, LLC
453 MWIn study Culberson, TXERCOT Oct 2023target 2028
TRIFECTA Gas
Gas · NET Power
453 MWIn study Midland, TXERCOT Jun 2023target 2030
Soleil Solar
Solar · Soleil Solar, LLC
452 MWAgreement signed Clay, TXERCOT Sep 2022target 2028
Zeissel Solar
Solar · ZSS Power, LLC
452 MWAgreement signed Knox, TXERCOT Feb 2022target 2028
Cedar Draw Solar
Solar + storage · Cedar Draw Solar LLC
451 MWIn study Scurry, TXERCOT Mar 2024target 2027
Calpine Guadalupe Peakers
Gas · Guadalupe Peaking Energy Center, LLC
450 MWIn study Guadalupe, TXERCOT Nov 2021target 2027
Page 4 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)