United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · SPPSolar + storage project GEN-2024-266, Potter County
Solar + storage project GEN-2024-266, Potter County is a 500 MW solar + storage request in interconnection study in the SPP interconnection queue, in Potter County, Texas, connecting to SPS.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2033 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-266
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Potter Co - Hitchland 345 kV Line
- Location
- Potter County, Texas
- Technology
- Solar: 500 MW · Battery
- Total requested
- 500 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- December 2033
Location
Marker shows the centre of Potter County; the queue data does not give exact sites.
Other requests in Potter County
- Battery storage project ERAS-2025-036, Potter CountyBattery storage · 140 MW · in study
- Carol SolarSolar · 223 MW · suspended
- Carol BatteryBattery storage · 168 MW · suspended
- CAROL windOnshore wind · 165 MW · suspended
- Solar project GEN-2023-239, Potter CountySolar · 300 MW · withdrawn
- Solar project GEN-2023-238, Potter CountySolar · 280 MW · withdrawn
- Battery storage project GEN-2022-133, Potter CountyBattery storage · 250 MW · withdrawn
- Battery storage project GEN-2023-208, Potter CountyBattery storage · 200 MW · withdrawn
- Solar project GEN-2019-036, Potter CountySolar · 70.0 MW · withdrawn
- Battery storage project GEN-2019-038, Potter CountyBattery storage · 50.0 MW · withdrawn
- Solar project GEN-2017-107, Potter CountySolar · 40.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem