United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-133, Potter County

Battery storage project GEN-2022-133, Potter County is a 250 MW battery storage request withdrawn in the SPP interconnection queue, in Potter County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-133
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
230 kV Rolling Hills Substation
Location
Potter County, Texas
Technology
Battery: 250 MW
Total requested
250 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 February 2023
Proposed online date
December 2027
Withdrawn
November 2023

Location

Marker shows the centre of Potter County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Potter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem