Solar project GEN-2017-107, Potter County

Solar project GEN-2017-107, Potter County is a 40.0 MW solar request withdrawn in the SPP interconnection queue, in Potter County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2017 (completed)
  2. Withdrawn / abandonedMar 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingApr 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-107
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Highland Park - Asarco 115 kV Line
Location
Potter County, Texas
Technology
Solar: 40.0 MW
Total requested
40.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
7 August 2017
Proposed online date
April 2020
Came online
April 2020
Withdrawn
March 2022

Location

Marker shows the centre of Potter County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Potter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem