United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hecate McCamey B Solar Solar · Hecate Energy |
400 MW | Withdrawn / abandoned |
| Invenergy Los Ojuelos Wind Onshore wind · Invenergy |
400 MW | Withdrawn / abandoned |
| Palo Duro Wind Onshore wind · Higher Power Energy, LLC |
400 MW | Withdrawn / abandoned |
| Zapata II W Onshore wind · Nextera |
400 MW | Withdrawn / abandoned |
| Lacy Creek W Onshore wind · Terra-Gen |
400 MW | Withdrawn / abandoned |
| Santa Rita Solar Solar · Invenergy |
400 MW | Withdrawn / abandoned |
| Gulf Wind 2 Onshore wind · Wind Development Contract Co, LLC |
400 MW | Withdrawn / abandoned |
| Fort Concho Wind Farm Onshore wind · Horizon Wind Energy |
400 MW | Withdrawn / abandoned |
| Los Vientos Phase III Onshore wind · Duke Energy Generation Services |
400 MW | Withdrawn / abandoned |
| Baker Ranch Onshore wind · Higher Power Energy, LLC |
400 MW | Withdrawn / abandoned |
| Vera Renewable Generation Center Onshore wind · Airtricity |
400 MW | Withdrawn / abandoned |
| Buzzing Bee Solar Solar · ACE DevCo NC, LLC |
400 MW | Withdrawn / abandoned |
| Gulf Wind 3 Onshore wind · Wind Development Contract Co, LLC |
400 MW | Withdrawn / abandoned |
| Bedias Solar Park Solar · Misae Energy III |
400 MW | Withdrawn / abandoned |
| Spectrum Solar Solar · IP Spectrum, LLC |
400 MW | Withdrawn / abandoned |
| Hoover's Ridge Wind Onshore wind · Clipper Windpower |
400 MW | Withdrawn / abandoned |
| Powersite Karnes Gas · Powersite |
396 MW | Withdrawn / abandoned |
| Ion Solar Solar · GSE Group LLC |
384 MW | Withdrawn / abandoned |
| Buffalo Gap 4 Onshore wind · AES SeaWest |
378 MW | Withdrawn / abandoned |
| Palacwnd Onshore wind · Palacios Wind, LLC |
367 MW | Withdrawn / abandoned |
| Queue Power Plant Gas · Pro Energy Services LLC |
363 MW | Withdrawn / abandoned |
| Toland Power Plant Gas · ProEnergy Services LLC |
363 MW | Withdrawn / abandoned |
| Guadalupe II Gas · Calpine |
362 MW | Withdrawn / abandoned |
| Normande Solar Farm Solar · 8minutenergy |
360 MW | Withdrawn / abandoned |
| Tehuacana Creek BESS-Alt POI Other · Tehuacana Creek Solar LLC |
356 MW | Withdrawn / abandoned |
| Boxcar Solar Solar · EDF Renewables Development, Inc. |
356 MW | Withdrawn / abandoned |
| Juno BESS Other · JUNO BESS |
355 MW | Withdrawn / abandoned |
| Orion Brangus Storage Other · ORION BESS |
355 MW | Withdrawn / abandoned |
| Savanna Prairie Solar Solar · Savanna Prairie Solar, LLC |
355 MW | Withdrawn / abandoned |
| Black Angus Onshore wind · Apex Clean |
353 MW | Withdrawn / abandoned |
| CPV Rattlesnake Den WindFarm Onshore wind · CPV Renewable Energy LLC |
350 MW | Withdrawn / abandoned |
| Chapman Ranch Wind 345 Onshore wind · Apex Wind |
350 MW | Withdrawn / abandoned |
| Noble Red Bank Windpark Onshore wind · Redbank, LLC |
350 MW | Withdrawn / abandoned |
| Silver Canyon Wind Farm Ph3 Onshore wind · Horizon Wind Energy |
350 MW | Withdrawn / abandoned |
| Azure Sky Wind 1 Onshore wind · Tradewind Energy |
350 MW | Withdrawn / abandoned |
| Scurry County Wind III Onshore wind · Invenergy |
350 MW | Withdrawn / abandoned |
| Gusty Hill Wind Onshore wind · Gusty Hill Wind Project, LLC |
350 MW | Withdrawn / abandoned |
| Pecan Creek 2 Gas Gas · NTE Energy |
350 MW | Withdrawn / abandoned |
| Umbra Solar II Solar · Saddle House Solar Project, LLC |
345 MW | Withdrawn / abandoned |
| Hutt Wind Onshore wind · Pioneer Natural Resources |
336 MW | Withdrawn / abandoned |
| King County Wind Farm Onshore wind · King County Wind Energy, LLC |
332 MW | Withdrawn / abandoned |
| Dexter Solar Solar · 241BB 8me LLC |
330 MW | Withdrawn / abandoned |
| Dexter Storage Other · 241BB 8ME LLC |
325 MW | Withdrawn / abandoned |
| Christoval Solar Solar · Bridgelink Cave Springs LLC |
324 MW | Withdrawn / abandoned |
| Apex Bethel CAES Battery storage · Apex CAES |
324 MW | Withdrawn / abandoned |
| Hale 1 Onshore wind · NextEra Energy |
322 MW | Withdrawn / abandoned |
| Panhandle Wind Onshore wind · Pattern Panhandle Wind, LLC |
322 MW | Withdrawn / abandoned |
| Hale Community W 1 Onshore wind · Nextera |
322 MW | Withdrawn / abandoned |
| Adams Brook Storage Other · Adams Creek Solar Project, LLC |
314 MW | Withdrawn / abandoned |
| Elrond Solar · IP Elrond, LLC |
313 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)