BATTERY STORAGE Β· ERCOT

Apex Bethel CAES

Apex Bethel CAES is a 324 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2011 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. ConsentedJun 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0013
Grid region
ERCOT (Texas)
Developer
Apex CAES
Connection point (POI)
tap 345kV 3380 Big Brown - 3133 Richland Chambers
Technology
Other Storage: 324 MW
Total requested
324 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
16 November 2011
Agreement signed
25 June 2015
Proposed online date
November 2020
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem