πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Pecan Creek 2 Gas

Pecan Creek 2 Gas is a 350 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0024
Grid region
ERCOT (Texas)
Developer
NTE Energy
Connection point (POI)
tap one 345kV 11420 Sweetwater - 11406 Central Bluff ckt
Technology
Gas: 350 MW
Total requested
350 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 March 2015
Proposed online date
June 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem