United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTDexter Storage
Dexter Storage is a 325 MW other request withdrawn in the ERCOT interconnection queue, in Runnels County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedJun 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0412
- Grid region
- ERCOT (Texas)
- Developer
- 241BB 8ME LLC
- Connection point (POI)
- tap 345kV 60040 Bluff Creek - 6444 Red Creek
- Location
- Runnels County, Texas
- Technology
- Other: 325 MW
- Total requested
- 325 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 August 2019
- Proposed online date
- June 2023
- Withdrawn
- June 2020
Location
Marker shows the centre of Runnels County; the queue data does not give exact sites.
Other requests in Runnels County
- Norton SolarSolar Β· 129 MW Β· agreement signed
- Rutile BESSBattery storage Β· 101 MW Β· agreement signed
- Winters Glow SolarSolar + storage Β· 302 MW Β· in study
- Sawtooth SolarSolar Β· 201 MW Β· in study
- Winters Glow StorageSolar + storage Β· 155 MW Β· in study
- Dexter SolarSolar Β· 330 MW Β· withdrawn
- Wagon Wheel SolarSolar Β· 145 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem