Guadalupe II is a 362 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedNov 2015 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 14INR0027
- Grid region
- ERCOT (Texas)
- Developer
- Calpine
- Connection point (POI)
- 7044 Marion 345kV
- Technology
- Gas: 362 MW
- Total requested
- 362 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 6 June 2012
- Agreement signed
- 3 November 2015
- Proposed online date
- June 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem