United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Guadalupe II

Guadalupe II is a 362 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0027
Grid region
ERCOT (Texas)
Developer
Calpine
Connection point (POI)
7044 Marion 345kV
Technology
Gas: 362 MW
Total requested
362 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
6 June 2012
Agreement signed
3 November 2015
Proposed online date
June 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem