ONSHORE WIND Β· ERCOT

Noble Red Bank Windpark

Noble Red Bank Windpark is a 350 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
10INR0015
Grid region
ERCOT (Texas)
Developer
Redbank, LLC
Technology
Wind: 350 MW
Total requested
350 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 April 2007
Proposed online date
May 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem