United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Palacwnd

Palacwnd is a 367 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedFeb 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0257
Grid region
ERCOT (Texas)
Developer
Palacios Wind, LLC
Connection point (POI)
28°57β€šΓ„β‰€7.8β€šΓ„β‰₯N; 96°10β€šΓ„β‰€28.4β€šΓ„β‰₯W White Point to STP 345kV
Location
Matagorda County, Texas
Technology
Wind: 367 MW
Total requested
367 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
November 2023
Withdrawn
February 2022

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem