πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Queue Power Plant

Queue Power Plant is a 363 MW gas request withdrawn in the ERCOT interconnection queue, in Galveston County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2019 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0223
Grid region
ERCOT (Texas)
Developer
Pro Energy Services LLC
Connection point (POI)
42061 Alta Loma 138kV
Location
Galveston County, Texas
Technology
Gas: 363 MW
Total requested
363 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
6 January 2019
Proposed online date
June 2021
Withdrawn
March 2019

Location

Marker shows the centre of Galveston County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Galveston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem