United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTIon Solar
Ion Solar is a 384 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0320
- Grid region
- ERCOT (Texas)
- Developer
- GSE Group LLC
- Connection point (POI)
- tap 345kV 1906 Venus - 68091 Navarro
- Technology
- Solar: 384 MW
- Total requested
- 384 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 17 May 2019
- Proposed online date
- May 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem