SOLAR Β· ERCOT

Ion Solar

Ion Solar is a 384 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0320
Grid region
ERCOT (Texas)
Developer
GSE Group LLC
Connection point (POI)
tap 345kV 1906 Venus - 68091 Navarro
Technology
Solar: 384 MW
Total requested
384 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
17 May 2019
Proposed online date
May 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem