ONSHORE WIND Β· ERCOT

Silver Canyon Wind Farm Ph3

Silver Canyon Wind Farm Ph3 is a 350 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0002c
Grid region
ERCOT (Texas)
Developer
Horizon Wind Energy
Technology
Wind: 350 MW
Total requested
350 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
3 January 2007
Proposed online date
December 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem