Toland Power Plant

Toland Power Plant is a 363 MW gas request withdrawn in the ERCOT interconnection queue, in San Patricio County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0252
Grid region
ERCOT (Texas)
Developer
ProEnergy Services LLC
Connection point (POI)
8961 Whitepoint 138kV
Location
San Patricio County, Texas
Technology
Gas: 363 MW
Total requested
363 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 February 2019
Proposed online date
June 2020
Withdrawn
September 2019

Location

Marker shows the centre of San Patricio County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in San Patricio County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem