SOLAR Β· ERCOT

Buzzing Bee Solar

Buzzing Bee Solar is a 400 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0282
Grid region
ERCOT (Texas)
Developer
ACE DevCo NC, LLC
Connection point (POI)
The Point of Interconnecting is the 345-kV Grissom Substation. PSSE Bus # 8624.
Technology
Solar: 400 MW
Total requested
400 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
May 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem