United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 34
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| watermelon 8 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Edgewood BESS 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| San Bernard Solar II Solar · San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Remy Jade III Power Station Gas · Remy Jade III Generating, LLC |
102 MW | Agreement signed |
| Opuntia Solar SLF Solar + storage · Opuntia Solar, LLC |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Roxton Storage Solar + storage · Roxton Solar, LLC |
102 MW | In study |
| Half Moon 2 BESS Battery storage |
102 MW | Paused / redesign |
| Stoneridge BESS Battery storage · Stoneridge Solar, LLC |
102 MW | Agreement signed |
| Kurtz Solar SLF Solar + storage · Kurtz Solar, LLC |
102 MW | In study |
| Pisgah Ridge Solar 2 Solar + storage · Pisgah Ridge Solar 2, LLC |
102 MW | In study |
| Pamela Heights I Battery storage · Pamela heights I Energy Center LLC |
102 MW | Agreement signed |
| Myers Solar Solar + storage · BT Myers Solar, LLC |
102 MW | In study |
| Greyhound Solar - Phase F Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
102 MW | Agreement signed |
| Lucky 7 Solar Solar · Lucky 7 Solar Farm LLC |
102 MW | Agreement signed |
| Kennedy Solar Solar + storage · Kennedy Bypass Solar LLC |
102 MW | In study |
| Jayhawk Solar Solar · Renewable Energy Ventures, LLC |
102 MW | In study |
| Lamkin Solar Solar · Commanche Solar, LLC |
102 MW | Agreement signed |
| Triangle Ranch Delta Onshore wind |
102 MW | Paused / redesign |
| Rose Quartz BESS Battery storage · Rose Quartz BESS, LLC |
101 MW | In study |
| Pisgah Ridge Storage 3 Solar + storage · Pisgah Ridge 3, LLC |
101 MW | In study |
| Raven Storage Battery storage · Raven Storage, LLC |
101 MW | Agreement signed |
| Blanket Ranch South Solar Solar + storage · Blanket Ranch South Solar, LLC |
101 MW | In study |
| Margay Energy Storage Battery storage · PowerPulse LLC |
101 MW | In study |
| Maddox Solar Solar · Industrial Lima Project LLC |
101 MW | In study |
| Megamouth Energy Storage Battery storage · GCI Megamouth, LLC |
101 MW | Agreement signed |
| Pinnacle Point Energy Storage Battery storage · GCI Pinnacle Point, LLC |
101 MW | In study |
| Blue Creek Energy Storage Battery storage · Blue Creek Energy Storage, LLC |
101 MW | In study |
| Blue Sky Sol Solar + storage · Blue Sky Solar LLC |
101 MW | Agreement signed |
| Kinney County Energy Battery storage · Kinney County Energy, LLC |
101 MW | In study |
| Lyford Energy Battery storage · Lyford Energy, LLC |
101 MW | In study |
| Southside Energy Battery storage · Southside Energy, LLC |
101 MW | In study |
| Citrus Flatts BESS Battery storage · Citrus Flatts Energy Center, LLC |
101 MW | Agreement signed |
| Hadrian Energy Storage Battery storage · Hadrian Energy Storage, LLC |
101 MW | In study |
| Hynes Bay Energy Storage Battery storage · Hynes Bay Energy Storage, LLC |
101 MW | In study |
| Strawberry Dunes Solar SLF Solar + storage · Strawberry Dunes LLC |
101 MW | In study |
| Saltillo Storage Battery storage |
101 MW | Paused / redesign |
| Las Moras Battery Battery storage · Las Moras Storage, LLC |
101 MW | In study |
| Solar Star Frontier BESS Battery storage · Solar Star Frontier BESS, LLC |
101 MW | In study |
| Luthor Solar Solar · TREX US Luthor LLC |
101 MW | In study |
| Matagorda Solar Solar · Matagorda Solar Farm, LLC |
101 MW | Agreement signed |
| Vaca Storage Battery storage · Long Mount Storage, LLC |
101 MW | In study |
| Glory Bee Storage Solar + storage · Riley Solar LLC |
101 MW | In study |
| Glasgow Storage Solar + storage · Glasgow Solar LLC |
101 MW | Agreement signed |
| Carambola BESS Battery storage · SMT McAllen II LLC |
101 MW | Agreement signed |
| Sandford Storage Solar + storage · BT Sandford Solar, LLC |
101 MW | In study |
| Paradiso BESS Battery storage · VESI 13 |
101 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)