United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTLuthor Solar
Luthor Solar is a 101 MW solar request in interconnection study in the ERCOT interconnection queue, in Howard County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0106
- Grid region
- ERCOT (Texas)
- Developer
- TREX US Luthor LLC
- Connection point (POI)
- Tap 138kV 23831 Luther Station βΓΓ¬ 10032 Little Luther
- Location
- Howard County, Texas
- Technology
- Solar: 101 MW
- Total requested
- 101 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 27 June 2022
- Proposed online date
- September 2027
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Ariji BESSBattery storage Β· 100 MW Β· agreement signed
- Infinium SolarSolar Β· 402 MW Β· in study
- Crater BESSBattery storage Β· 302 MW Β· in study
- Bhalu StorageBattery storage Β· 206 MW Β· in study
- Les Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage MidlandBattery storage Β· 205 MW Β· in study
- Prospector Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage OdessaBattery storage Β· 203 MW Β· in study
- Rattlesnake Gap Wind SLFOnshore wind Β· 200 MW Β· in study
- Prairie Blossom StorageBattery storage Β· 123 MW Β· in study
- Calf Creek StorageBattery storage Β· 101 MW Β· in study
- Rattlesnake Gap Solar SLFSolar + storage Β· 93.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem