United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Prospector Energy Storage

Prospector Energy Storage is a 205 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Howard County, Texas.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0485
Grid region
ERCOT (Texas)
Developer
Prospector Storage LLC
Connection point (POI)
Natural Dam 138kV Substation (23836)
Location
Howard County, Texas
Technology
Battery: 205 MW
Total requested
205 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
16 August 2024
Proposed online date
September 2026

Location

Marker shows the centre of Howard County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Howard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem