BATTERY STORAGE Β· ERCOTSaltillo Storage
Saltillo Storage is a 101 MW battery storage request suspended in the ERCOT interconnection queue, in Bastrop County, Texas.
Queue statusPaused / redesign
- PlanningQueued May 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0073
- Grid region
- ERCOT (Texas)
- Location
- Bastrop County, Texas
- Technology
- Battery: 101 MW
- Total requested
- 101 MW
- Queue status
- Suspended
- Entered queue
- 9 May 2022
- Proposed online date
- June 2025
Location
Marker shows the centre of Bastrop County; the queue data does not give exact sites.
Other requests in Bastrop County
- Bastrop Peaking Generators (TEF-Due Diligence)Gas Β· 1,104 MW Β· agreement signed
- Big Star SolarSolar Β· 203 MW Β· agreement signed
- Waterloo Solar 1Solar + storage Β· 201 MW Β· agreement signed
- Waterloo BESS 1Solar + storage Β· 106 MW Β· agreement signed
- Big Star StorageBattery storage Β· 80.0 MW Β· agreement signed
- Sim Gideon Combined CycleGas Β· 880 MW Β· in study
- Lost Pines Power ParkGas Β· 880 MW Β· in study
- Fort Worth Power Core Bastrop Gas PlantGas Β· 506 MW Β· in study
- Lund Storage Center 1Battery storage Β· 408 MW Β· in study
- Sim Gideon Gas RiceGas Β· 226 MW Β· in study
- Techne BESSBattery storage Β· 203 MW Β· in study
- Antonio Road BESSBattery storage Β· 156 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem