United States › Grid › Interconnection queues › Texas

GAS · ERCOT

Fort Worth Power Core Bastrop Gas Plant

Fort Worth Power Core Bastrop Gas Plant is a 506 MW gas request in interconnection study in the ERCOT interconnection queue, in Bastrop County, Texas.

Queue statusIn planning
  1. PlanningQueued May 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0560
Grid region
ERCOT (Texas)
Developer
Fort Worth Power Core LLC
Connection point (POI)
Tap 345kV 7042 ZORN - 7040 AUSTROP
Location
Bastrop County, Texas
Technology
Gas: 506 MW
Total requested
506 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
27 May 2025
Proposed online date
September 2029

Location

Marker shows the centre of Bastrop County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Bastrop County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem