OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Evergreen Storage Other · Evergreen Energy LLC |
100 MW | Withdrawn / abandoned |
| Elmer Battery Other · Energy Storage Resources, LLC |
100 MW | Withdrawn / abandoned |
| Hylton Mountain Onshore wind · Gamesa Energia SW |
100 MW | Withdrawn / abandoned |
| Loraine Windpark Phase III Onshore wind · Third Planet Wind Power |
100 MW | Withdrawn / abandoned |
| Caballo Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| Solar Prime TX-4 Solar · Solar Prime LLC |
100 MW | Withdrawn / abandoned |
| Gardner Draw 2 Solar Solar · RWE Solar Development, LLC |
100 MW | Withdrawn / abandoned |
| BNB Oxbow Solar Solar · BNB Renewables |
100 MW | Withdrawn / abandoned |
| Castro Solar Solar · Oaktree Development |
100 MW | Withdrawn / abandoned |
| Pin Oak Wind Onshore wind · Limestone Wind Project, LLC |
100 MW | Withdrawn / abandoned |
| Permian Solar Solar · SolarCity |
100 MW | Withdrawn / abandoned |
| Juggernaut Other · Energy Storage Resources |
100 MW | Withdrawn / abandoned |
| Monaville Solar Solar · Monaville Solar LLC |
100 MW | Withdrawn / abandoned |
| Craver Ranch Solar · S Power |
100 MW | Withdrawn / abandoned |
| High Lonesome Wind Farm Onshore wind · High Lonesome Wind, LLC |
100 MW | Withdrawn / abandoned |
| RE Maplewood 2d Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| Karankawa 2 Expansion Onshore wind · Karankawa Wind, LLC |
98.3 MW | Withdrawn / abandoned |
| Llano Estacado Energy Storage Other · VESI 40 LLC |
98.0 MW | Withdrawn / abandoned |
| RE Palmwood 1 Solar Solar · Recurrent Energy |
98.0 MW | Withdrawn / abandoned |
| Percy Farm Solar 2 Solar · AELIUS SOLAR CORP |
96.6 MW | Withdrawn / abandoned |
| Fence Post Solar MW Increase Solar · Fence Post Solar Project, LLC |
95.7 MW | Withdrawn / abandoned |
| Hidalgo Chillers Gas · Calpine |
95.0 MW | Withdrawn / abandoned |
| Amelia Dairy Solar Solar · Amelia Dairy Solar LLC |
94.1 MW | Withdrawn / abandoned |
| Windthorst-2 Wind Farm Onshore wind · Windthorst-2, LLC |
94.0 MW | Withdrawn / abandoned |
| Oilton 1 Wind Onshore wind · Spinnaker Wind |
94.0 MW | Withdrawn / abandoned |
| Frame Switch Energy Gas · Frame Switch |
92.0 MW | Withdrawn / abandoned |
| Jaguarundi Storage Other · Jaguarundi Solar, LLC |
91.1 MW | Withdrawn / abandoned |
| Roscoe 2 addition Onshore wind · Airtricity, Inc |
91.0 MW | Withdrawn / abandoned |
| Jaguarundi Solar Solar · Jaguarundi Solar, LLC |
90.3 MW | Withdrawn / abandoned |
| Delilah Solar 4 Solar |
90.0 MW | Withdrawn / abandoned |
| Jackson Mountain Onshore wind · Gamesa Energy USA |
90.0 MW | Withdrawn / abandoned |
| City Farm Solar Energy Solar · TerraGen Power, LLC |
90.0 MW | Withdrawn / abandoned |
| First Solar - Uvalde Solar Solar · First Solar |
90.0 MW | Withdrawn / abandoned |
| Chinati Solar Power Solar · TerraGen Power, LLC |
90.0 MW | Withdrawn / abandoned |
| Leon River Wind Farm Onshore wind · Gamesa Energy USA |
90.0 MW | Withdrawn / abandoned |
| Wise County Plant Upgrade Gas · GDF-Suez Energy North America, Inc |
90.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 1 Solar · SunPower |
88.0 MW | Withdrawn / abandoned |
| Hedgehog Solar Solar · Innovative Solar 408, LLC |
85.0 MW | Withdrawn / abandoned |
| Twin Mountain Solar Solar · Orion Renewable Resources LLC |
83.9 MW | Withdrawn / abandoned |
| Dusky Storage Other · Cypress Creek Renewables |
83.0 MW | Withdrawn / abandoned |
| Val Verde Wind B Onshore wind · Akuo Energy USA |
82.0 MW | Withdrawn / abandoned |
| Corpus Christi Upgrade Gas · Calpine |
82.0 MW | Withdrawn / abandoned |
| Solemio Solar · SOLEMIO LLC |
81.4 MW | Withdrawn / abandoned |
| Lunis Creek Storage 1 Battery storage · Lunis Creek Solar Project, LLC |
81.2 MW | Withdrawn / abandoned |
| Western Ranch Solar1 Solar · Quantum Utility Generation |
81.0 MW | Withdrawn / abandoned |
| Zircon BESS Battery storage · Zircon BESS LLC |
80.4 MW | Withdrawn / abandoned |
| Mica BESS Battery storage · Mica BESS LLC |
80.4 MW | Withdrawn / abandoned |
| Silver Wind Onshore wind · Cielo Wind Power |
80.0 MW | Withdrawn / abandoned |
| Timberwolf Solar Increase Solar · CED Crane Solar 2, LLC |
80.0 MW | Withdrawn / abandoned |
| Mariah Solar I Solar · Scatec Energy |
80.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)