United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in ERCOT (Texas) — page 18

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,158262.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,158 requests · page 18 of 24
ProjectCapacityStatusLocationRegionQueuedOnline
Evergreen Storage
Other · Evergreen Energy LLC
100 MWWithdrawn / abandoned Matagorda, TXERCOT Jun 2022target 2025
Elmer Battery
Other · Energy Storage Resources, LLC
100 MWWithdrawn / abandoned Tarrant, TXERCOT May 2019target 2021
Hylton Mountain
Onshore wind · Gamesa Energia SW
100 MWWithdrawn / abandoned ERCOT Mar 2005target 2050
Loraine Windpark Phase III
Onshore wind · Third Planet Wind Power
100 MWWithdrawn / abandoned Mitchell, TXERCOT Aug 2017target 2024
Caballo Solar
Solar · Recurrent Energy
100 MWWithdrawn / abandoned ERCOT Mar 2014target 2018
Solar Prime TX-4
Solar · Solar Prime LLC
100 MWWithdrawn / abandoned ERCOT Apr 2013target 2014
Gardner Draw 2 Solar
Solar · RWE Solar Development, LLC
100 MWWithdrawn / abandoned ERCOT Sep 2025target 2027
BNB Oxbow Solar
Solar · BNB Renewables
100 MWWithdrawn / abandoned ERCOT Nov 2013target 2017
Castro Solar
Solar · Oaktree Development
100 MWWithdrawn / abandoned ERCOT May 2017target 2019
Pin Oak Wind
Onshore wind · Limestone Wind Project, LLC
100 MWWithdrawn / abandoned Navarro, TXERCOT May 2019target 2024
Permian Solar
Solar · SolarCity
100 MWWithdrawn / abandoned ERCOT Jun 2015target 2016
Juggernaut
Other · Energy Storage Resources
100 MWWithdrawn / abandoned Waller, TXERCOT May 2019target 2020
Monaville Solar
Solar · Monaville Solar LLC
100 MWWithdrawn / abandoned Waller, TXERCOT Feb 2019target 2021
Craver Ranch
Solar · S Power
100 MWWithdrawn / abandoned Denton, TXERCOT Oct 2017target 2019
High Lonesome Wind Farm
Onshore wind · High Lonesome Wind, LLC
100 MWWithdrawn / abandoned ERCOT Mar 2007target 2050
RE Maplewood 2d Solar
Solar · Recurrent Energy
100 MWWithdrawn / abandoned Pecos, TXERCOT Oct 2014target 2020
Karankawa 2 Expansion
Onshore wind · Karankawa Wind, LLC
98.3 MWWithdrawn / abandoned San Patricio, TXERCOT May 2019target 2022
Llano Estacado Energy Storage
Other · VESI 40 LLC
98.0 MWWithdrawn / abandoned Howard, TXERCOT Apr 2022target 2025
RE Palmwood 1 Solar
Solar · Recurrent Energy
98.0 MWWithdrawn / abandoned ERCOT Sep 2014target 2017
Percy Farm Solar 2
Solar · AELIUS SOLAR CORP
96.6 MWWithdrawn / abandoned ERCOT Jan 2022target 2024
Fence Post Solar MW Increase
Solar · Fence Post Solar Project, LLC
95.7 MWWithdrawn / abandoned Navarro, TXERCOT target 2022
Hidalgo Chillers
Gas · Calpine
95.0 MWWithdrawn / abandoned ERCOT Nov 2012target 2016
Amelia Dairy Solar
Solar · Amelia Dairy Solar LLC
94.1 MWWithdrawn / abandoned Wood, TXERCOT target 2025
Windthorst-2 Wind Farm
Onshore wind · Windthorst-2, LLC
94.0 MWWithdrawn / abandoned ERCOT Oct 2009target 2050
Oilton 1 Wind
Onshore wind · Spinnaker Wind
94.0 MWWithdrawn / abandoned ERCOT Feb 2011target 2050
Frame Switch Energy
Gas · Frame Switch
92.0 MWWithdrawn / abandoned ERCOT Dec 2013target 2020
Jaguarundi Storage
Other · Jaguarundi Solar, LLC
91.1 MWWithdrawn / abandoned Archer, TXERCOT Mar 2023target 2025
Roscoe 2 addition
Onshore wind · Airtricity, Inc
91.0 MWWithdrawn / abandoned ERCOT Nov 2006
Jaguarundi Solar
Solar · Jaguarundi Solar, LLC
90.3 MWWithdrawn / abandoned Archer, TXERCOT Mar 2023target 2027
Delilah Solar 4
Solar
90.0 MWWithdrawn / abandoned Lamar, TXERCOT Jul 2020
Jackson Mountain
Onshore wind · Gamesa Energy USA
90.0 MWWithdrawn / abandoned ERCOT Mar 2005target 2050
City Farm Solar Energy
Solar · TerraGen Power, LLC
90.0 MWWithdrawn / abandoned ERCOT Apr 2009target 2050
First Solar - Uvalde Solar
Solar · First Solar
90.0 MWWithdrawn / abandoned ERCOT Dec 2010target 2050
Chinati Solar Power
Solar · TerraGen Power, LLC
90.0 MWWithdrawn / abandoned ERCOT Apr 2009target 2050
Leon River Wind Farm
Onshore wind · Gamesa Energy USA
90.0 MWWithdrawn / abandoned ERCOT Jan 2007target 2050
Wise County Plant Upgrade
Gas · GDF-Suez Energy North America, Inc
90.0 MWWithdrawn / abandoned ERCOT Apr 2010target 2050
Parker Ranch Solar 1
Solar · SunPower
88.0 MWWithdrawn / abandoned ERCOT Aug 2014target 2018
Hedgehog Solar
Solar · Innovative Solar 408, LLC
85.0 MWWithdrawn / abandoned Medina, TXERCOT Dec 2019target 2025
Twin Mountain Solar
Solar · Orion Renewable Resources LLC
83.9 MWWithdrawn / abandoned Comanche, TXERCOT Jul 2019target 2023
Dusky Storage
Other · Cypress Creek Renewables
83.0 MWWithdrawn / abandoned Hill, TXERCOT Jun 2018target 2020
Val Verde Wind B
Onshore wind · Akuo Energy USA
82.0 MWWithdrawn / abandoned ERCOT Jan 2010target 2015
Corpus Christi Upgrade
Gas · Calpine
82.0 MWWithdrawn / abandoned ERCOT Feb 2014target 2019
Solemio
Solar · SOLEMIO LLC
81.4 MWWithdrawn / abandoned Hopkins, TXERCOT Jun 2017target 2023
Lunis Creek Storage 1
Battery storage · Lunis Creek Solar Project, LLC
81.2 MWWithdrawn / abandoned Jackson, TXERCOT May 2019target 2023
Western Ranch Solar1
Solar · Quantum Utility Generation
81.0 MWWithdrawn / abandoned ERCOT Apr 2009target 2050
Zircon BESS
Battery storage · Zircon BESS LLC
80.4 MWWithdrawn / abandoned La Salle, TXERCOT Jan 2025target 2028
Mica BESS
Battery storage · Mica BESS LLC
80.4 MWWithdrawn / abandoned Harris, TXERCOT Nov 2024target 2026
Silver Wind
Onshore wind · Cielo Wind Power
80.0 MWWithdrawn / abandoned ERCOT Jan 2002target 2050
Timberwolf Solar Increase
Solar · CED Crane Solar 2, LLC
80.0 MWWithdrawn / abandoned Upton, TXERCOT Aug 2019target 2021
Mariah Solar I
Solar · Scatec Energy
80.0 MWWithdrawn / abandoned ERCOT Jan 2013target 2014
Page 18 of 24

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)