United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTEvergreen Storage
Evergreen Storage is a 100 MW other request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0335
- Grid region
- ERCOT (Texas)
- Developer
- Evergreen Energy LLC
- Connection point (POI)
- 8111 Magilla 138kV
- Location
- Matagorda County, Texas
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 1 June 2022
- Proposed online date
- December 2025
- Withdrawn
- December 2024
Location
Marker shows the centre of Matagorda County; the queue data does not give exact sites.
Other requests in Matagorda County
- Duffy SolarSolar + storage Β· 503 MW Β· agreement signed
- Lavaca Bay SolarSolar Β· 244 MW Β· agreement signed
- Peyton Creek Wind IIOnshore wind Β· 241 MW Β· agreement signed
- Duffy BESSSolar + storage Β· 241 MW Β· agreement signed
- Eldora BESSSolar + storage Β· 201 MW Β· agreement signed
- Eldora SolarSolar + storage Β· 201 MW Β· agreement signed
- City Breeze BESSBattery storage Β· 143 MW Β· agreement signed
- Matagorda SolarSolar Β· 101 MW Β· agreement signed
- Isaac SolarSolar Β· 50.7 MW Β· agreement signed
- Bluefox Solar 1Solar Β· 403 MW Β· in study
- Bluefox Solar 2Solar Β· 402 MW Β· in study
- Juanita Creek BESSBattery storage Β· 304 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem