Mariah Solar I

Mariah Solar I is a 80.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0042
Grid region
ERCOT (Texas)
Developer
Scatec Energy
Connection point (POI)
Windmill (79502)
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
8 January 2013
Proposed online date
September 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem