United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Gardner Draw 2 Solar

Gardner Draw 2 Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0569
Grid region
ERCOT (Texas)
Developer
RWE Solar Development, LLC
Connection point (POI)
59902 Sand Bluff 345 kV
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
22 September 2025
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem