United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Pin Oak Wind

Pin Oak Wind is a 100 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedOct 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0321
Grid region
ERCOT (Texas)
Developer
Limestone Wind Project, LLC
Connection point (POI)
tap 138kV 3515 Hubbard - 213 Haney
Location
Navarro County, Texas
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 May 2019
Proposed online date
June 2024
Withdrawn
October 2021

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Navarro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem